Place: Copenhagen, Denmark
Used products: EMHP
Energy is stored in the building’s foundation piles through a Pile Thermal Energy Storage system, supplying the 4,700 m² office with near-surface geothermal heating (110 kW) and cooling (80 kW). The building is set to achieve DGNB Gold.


